Sheet vinyl and planks.
Floating vinyl floor on concrete.
A vinyl sheet may be forgiving if your concrete slab isn t perfectly even.
Suitable vinyl flooring for basements pretty much includes all vinyl flooring but if you re looking for a floating floor that requires no adhesive and goes directly over concrete two options stand out.
In choosing a wood subfloor many professionals like to use osb oriented strand board or.
Also the possibility of dampness however small is greater when there are fewer membranes between your concrete foundation and your floating floor.
A subfloor is the bottom layer of any floor.
The floating approach is used in many scenarios where the flooring is being installed over an old adhesive left behind from an earlier flooring product or anything involving.
As much as this flooring material may seem to be a perfect flooring it would be prudent to consider vinyl plank flooring pros and cons.
Vinyl plank installation on concrete makes the floor warm and comfortable.
Types of vinyl for basement flooring.
It can be constructed from wood plywood plastic or concrete.
If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins.
Vinyl plank is a floating floor which means you don t ever actually attach it to the underlay.
The hardest part of the job is often cleaning and leveling the concrete base.
Durable vinyl sheet flooring is fiberglass reinforced and does a nice job.
Vinyl flooring is very durable and fits over most surfaces including concrete.
Vinyl plank is designed to connect through click and lock and glue down techniques.
You just lay it over top.
Concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project.
Vinyl plank flooring is water resistant and if it has a wpc core it s waterproof so it won t be damaged by the off gassing.
How to install vinyl plank flooring.
You leave enough of a gap around the edge that it can expand contract flex whatever but that it s hidden by baseboard.
Newly poured concrete off gases water vapor and typically needs from 120 to 150 days to dry out before it s ready to accept flooring according to milliken company.
Laying down your floating flooring directly onto concrete is a no no.
So technically if you are installing vinyl plank flooring onto concrete you already have a subfloor.
Although the flooring comes in a variety of forms planks are installable with a minimal amount of tools and measuring.
For one there s less insulation.
This vinyl type comes in a single sheet that is installed over the concrete floor.