Installing a hardwood floor over a concrete slab.
Floating engineered hardwood floor over concrete.
Installing floors is a difficult diy job.
If the concrete is below grade bring the plastic at least 4 10cm up the wall.
You will trim it off at the height of the baseboard once the flooring has.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
You have two basement wood flooring options solid hardwood or engineered.
Most people can install this type of hardwood flooring as long as they are willing to do a little bit of work.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Other products are better suited for a nail down installation where they are secured to a wood subfloor with nails or staples.
Check the manufacturer s recommendations but in most cases it s a minimum of three days with no maximum.
Here are the basics of how to install floating hardwood floors over concrete.
How to install engineered wood over concrete apply adhesive.
Use a hammer and tapping block to make sure pieces fit.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
You may not need to build a plywood subfloor on top of the concrete slab depending on the floor system you choose.
Start installing pieces on a long straight wall.
Engineered flooring goes down over a thin foam sheet which provides cushioning and sound dampening.
The easiest way to install hardwood is a floating floor.
There are some key differences in engineered wood vs.
Floating wood flooring can provide you with a simple installation and a beautiful floor at the same time.
If installing the floor over concrete lay 1 4 6mm plastic sheeting over the concrete and overlap the seams by at least 8 20cm.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
A smooth expanse of wood flooring adds warmth and anchors a room.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
You need to leave a 5 16 inch gap between the flooring and the baseboard or wall around the perimeter of the room to allow the floor enough space to expand.
Using a v notched trowel spread adhesive over a section of the floor.
How to install floating engineered hardwood floor.
Check the drying time for your.
The planks glue together to create a floor that floats moves freely as a unit.
Your very first step before installing engineered hardwood floors over concrete is to let the boards acclimate to the room where they re going to be installed.